How to achieve clean LED lines in stairwells?

Reference projects5 min read
Reto Bonderer
Reto Bonderer
CTO, head of Marketing, smarterion ag · Mels
Last checked: November 28, 2026

The most important first

For complex stairwells and corridors, a linear lighting solution can be implemented much more efficiently with digital planning than manually. In the Zürich reference project, the floor plan was planned in the free luxKIT app, a bill of materials generated, and the material subsequently ordered specifically. This allowed material requirements and costs to be calculated exactly, without deviation from the plan.

What stood out to us at smarterion ag in this project is that the actual challenge was not the luminaire itself, but the clean depiction of every line in the floor plan. This is precisely where most questions arise in practice, especially when multiple floors are involved and every corner must sit correctly. For electricians and planners, this is relevant because the effort is not only on site, but already in the planning.

Starting situation in the hotel in Zürich

The reference project concerned a hotel in Zürich with several floors and was implemented in 2026. The lighting solution should provide continuous lines in stairwells and corridors, i.e., areas where mass, transitions and connections cannot be covered with a standard grid. For this reason the project was anonymized as a reference without permission for name and images.

Why was the planning so elaborate?

Planning complex floor plans is extremely time-consuming, because often every line has to be measured individually and then planned manually. Problems at corner connections and shadows also arise when LED strips do not lie cleanly on the cut grid. Many expect that such lines can simply be solved with some cutting, but in practice the upfront work determines the result.

TopicManual planningPlanning with luxKIT
Floor plan processingManually record individual measurementsLoad floor plan in the app and draw the luminaires
Bill of materialsAssemble manuallyAutomatically generated
Preparation for assemblyMore coordination and correctionsOrder material and cut to size on site
ConnectionsCorner connections prone to shadowsClick parts quickly and easily in the modular system
Comparison of relevant project factors

Which solution was used?

The choice fell on luxKIT from smarterion ag because the modular system could exploit the advantages in this project particularly well. With the free luxKIT app, the floor plan was loaded, the luminaires drawn, and a bill of materials generated. Subsequently the material could be ordered specifically, which greatly simplified planning and cost calculation.

Complex starting situation, simple handling
— Reto Bonderer, CTO und Leiter Marketing, smarterion ag

We have seen in practice that this exact digital step provides the biggest leverage. It was not the installation itself that was the bottleneck, but the clean translation of the floor plan into materials and work steps. Addressing this early and cleanly reduces questions and avoids later corrections.

How was the implementation with luxKIT carried out?

  1. Load the floor plan in the free luxKIT app and draw the light lines.
  2. Automatically generate a bill of materials and order the material.
  3. Cut profiles to size on site.
  4. Click the parts together in the modular system quickly and easily.

Contrary to the assumption that a complex line routing automatically means more mounting effort, the benefit here lay mainly in the clear process chain. The connection and shadow problems were no longer present with the modular system. The project thus shows that the simplification does not start at installation, but already at the digital preparation.

What was the practical result?

0 %Abweichung des Budgets im Projekt in Zürich
2026Jahr der Ausführung
mehrere StockwerkeUmfang des Hotels in Zürich

smarterion ag

The budget did not deviate from the plan because material requirements could be planned exactly with luxKIT and costs calculated. At the same time, the clean preparation and clickable connections led to less planning time, fewer questions and fewer problems during installation. For the hotel, this meant a coherent overall picture; for the project team, a noticeably smoother execution.

What can electricians and planners take away from this?

The most important lesson from our perspective is clear: with complex light lines, a continuous planning process determines effort and result. If you think of floor plan, bill of materials and installation in one system, you save not only time but also achieve greater cost certainty. For multi-story projects this is especially valuable, because any additional coordination quickly adds up.

Frequently asked questions

Where is the biggest time saving in such projects?
The biggest time savings come from digital planning and the bill of materials. If the floor plan is cleanly prepared in the app, dimensions do not have to be transferred manually multiple times. This reduces questions even before installation.
Why were no other solutions offered?
In the present reference project, luxKIT was chosen directly because the modular system best met the requirements. The decisive factor was the combination of planning, ordering and simple installation. It was not about a broad comparison of many systems, but about the concrete suitability for this floor plan.
Is this also worthwhile for smaller objects?
Yes, but the benefit increases with the complexity of the floor plan. The more corners, transitions and floors come together, the stronger the effects of digital planning and pre-fabricated parts. For very simple lines, the added value is less pronounced.
What about release for names, location or images?
For this reference project no concrete release for name, location or images was provided. Therefore the presentation remains deliberately anonymized and focused on the technical process. This keeps the reference credible without using non-released details.

For similar projects: the more complex the floor plan, the more important it is to have a solution that links planning, cutting and installation without media discontinuity. This was the decisive advantage in the Zürich hotel. If you want to implement such lines more efficiently in the future, start the process digitally from the beginning.

Planen Sie Ihr Projekt mit smarterion ag

smarterion ag, Mels

Beratung anfragen