The most important thing first
At SF Elektro-Engineering AG, crane retrofit focuses on modernizing the electrical side of a crane, not the load-bearing structure or gear train. This allows targeted renewal of drive technology, zone-appropriate safety and weight verification, often with fewer interventions and lower costs than a mechanical replacement. In several internal projects the load-bearing structure was preserved because it was still in good condition.
From our experience it repeatedly shows: the biggest leverage is not swapping as many parts as possible, but choosing the right electrical modular units. It is exactly there that the economically most favorable path often arises when the steel construction is still good and modernization targets availability, safety and energy efficiency.
What does crane retrofit mean from an electrical engineering perspective?
A crane consists of two worlds sharing a steel structure: machine technology and electrical engineering. At SF Elektro-Engineering AG we deliberately focus on the electrical side of the axes, i.e. drive, control, safety and sensing. The load-bearing structure and gear train remain untouched.
Typical assemblies include hoisting gear, crane running gear, cat gear, slewing gear and, depending on the application, also the gripper. The shift in perspective is decisive: not the plant parts change, but the retrofit focus.
Which drive technology fits the crane?
For the drive side we work as a Siemens solution partner with two frequency converter families. SINAMICS G120 is suitable for compact, individually operated axes, for example auxiliary drives or smaller lifting devices. SINAMICS S120 is usually the right choice for cranes with several coordinated axes.
With S120 there are functions that are directly designed for crane operation: sway damping, master-slave torque control, load-dependent field weakening, Load Sag Prevention and energy recovery in 4Q operation. The goal is clear: less swaying, smoother operation, better energy utilization and a quieter ride.
In our projects the effect is tangible. In the Chur foundry four SINAMICS S120 drives together with an S7-1512SP control achieve more energy efficiency, sway-free operation and availability. At KIBAG Tiefenbrunnen the combination of SINAMICS S120 with regenerative power and IE4 motors led to about 50% energy savings.
SF Elektro-Engineering AG
With the MODEL Reni bunker crane, using a 4Q-capable frequency converter alone saved about 1,600 kWh per 100 operating hours. This shows how much energy can be recovered between lowering and braking when the electrical design is right.
How does zone management work with functional safety?
A crane rarely moves alone in a room. Neighboring systems, building parts, other cranes on the same crane runway or areas where people are present create zones that must be restricted, reduced or completely excluded depending on the situation. For this we deploy safety-integrated controls with position sensing on the axes.
From the continuously captured actual positions of crane running gear, cat gear and hoisting gear, virtual zones are derived. The safety control then automatically reduces speed or stops the movement, without mechanical limit switches as additional wear and fault points.
At the Chur foundry, zoned-specific functional safety is among the improvements achieved. At KIBAG Tiefenbrunnen the zoned functional safety was implemented specifically with a Safety-SPS to protect neighboring systems during ship unloading.
Practical rule for cranes in tight installations
The closer a crane comes to other installations or cranes, the more important a clean zone logic becomes. In such environments, an electrically implemented limit is often more robust than purely mechanical end switches, because it creates fewer additional fault sources during operation.
Why is weight verification more than just overload protection?
Load monitoring serves two purposes on cranes: as a safety function to prevent overload and as process data the basis for documentation, billing and traceability. For this we use our weighing technology competence and apply it to the crane.
An integrated load cell or a force measurement bolt provides the current load weight directly to the control. It is used for overload shutdown, for load-dependent field weakening, and for the seamless documentation of the lifted loads.
For us, crane weighing is therefore not a separate add-on system, but another application of the same control level. Moving loads, exact weights and traceable data belong together in our view.
What other elements belong to crane retrofit?
- Control and operation with SIMATIC S7-1512SP, ET200SP and Comfort Panels
- Wireless control instead of fixed cabin when more flexibility is needed
- Remote maintenance and redundancy for better availability in hard-to-reach installations
- Predictive maintenance via sensors and data analysis
- Sensor reduction through intelligent engineering rather than blind replacement
- Proof of network quality after modernization when several frequency converters run on the same connection
- Rapid commissioning when schedule is tight
- Updating the crane log as part of the modernization
At KIBAG Tiefenbrunnen the fixed control was replaced with a wireless control from HBC-Radiomatic. This increases the crane operator’s flexibility and reduces wiring at the crane itself.
On the MODEL Reni bunker crane the plant was back in operation after only four working days. To us this is a good example that a purely electrical retrofit can be tightly planned if the mechanical structure is preserved.
Frequently asked questions
When is an electro-technical crane retrofit particularly worthwhile?
Does every crane need a new mechanical end stop for the zones?
What is the purpose of weight verification besides overload protection?
How quickly can such a retrofit be implemented?
From an electrical engineering perspective, crane retrofit delivers the greatest benefit where drive technology, zone-appropriate safety and weight verification are considered together. This is how we at SF Elektro-Engineering AG improve energy efficiency, availability and safety without unnecessarily altering the mechanical structure.
If you are planning a crane retrofit, it is worth focusing on the electrical side first. This turns a classic service into a tailored modernization with measurable added value for operations.
Planen Sie Ihren Kran-Retrofit mit uns
SF Elektro-Engineering AG, Flums